
Prototyping
First samples off the mould for your approval, and a 3D-printed model to check the design before steel is cut.
- Samples
- First samples (T0) off the mould
- New mould
- 45–90 days
- First samples
- 45–60 days
- Design check
- A 3D-printed model
- Repeat orders
- 1 week

Samples off the mould, for your approval
Samples come off the production mould. Once the mould exists, we mould and plate first samples (T0) for you to approve before production starts. For a new part, first samples take 45 to 60 days. Before steel is cut, a 3D-printed model of the part can be checked against your drawing.
How long it takes
From the times we quote for a new part and a repeat order. Each bar runs from the shortest time to the longest.
- New mould45–90 days
- First samples45–60 days
- Repeat orders1 week
From drawing to approved sample
- Your drawing or sample
- The part and the mould designed in CAD
- A 3D-printed model checked against the drawing
- The mould made in our tool room
- First samples (T0), moulded and plated, for your approval
- Production, once you approve the samples


Send us your drawing
PDF, STEP, DWG or a photo of the part, with roughly how many you need and the finish.
We reply within 2–3 working days.
- Call
- +91 70278 89712Navit Rathee
Drop your drawing hereAttach your drawing or a photoAttach your drawing on the quote form
Request a quote
- Drawing
- None attached
- Formats
- PDF, STEP, IGES, DWG, DXF, STL, JPG, PNG
- Limit
- 5 files, 20 MB each
- Used
- Only to prepare your quote

