A yellow sample part taking shape on the 3D printer's bed
A 3D-printed model, to check the design before steel is cut

Prototyping

First samples off the mould for your approval, and a 3D-printed model to check the design before steel is cut.

Samples
First samples (T0) off the mould
New mould
45–90 days
First samples
45–60 days
Design check
A 3D-printed model
Repeat orders
1 week
An operator at a Neelgiri injection moulding machine and its robot
A press and its robot in the moulding hall

Samples off the mould, for your approval

Samples come off the production mould. Once the mould exists, we mould and plate first samples (T0) for you to approve before production starts. For a new part, first samples take 45 to 60 days. Before steel is cut, a 3D-printed model of the part can be checked against your drawing.

How long it takes

From the times we quote for a new part and a repeat order. Each bar runs from the shortest time to the longest.

  1. New mould45–90 days
  2. First samples45–60 days
  3. Repeat orders1 week

From drawing to approved sample

  1. Your drawing or sample
  2. The part and the mould designed in CAD
  3. A 3D-printed model checked against the drawing
  4. The mould made in our tool room
  5. First samples (T0), moulded and plated, for your approval
  6. Production, once you approve the samples
A designer modelling a part and its tool in CAD
The two halves of an injection mould on the toolmaker's bench
The part modelled on screen, and one of our moulds on the toolmaker's bench

Send us your drawing

PDF, STEP, DWG or a photo of the part, with roughly how many you need and the finish.

We reply within 2–3 working days.

Call
+91 70278 89712Navit Rathee

Drop your drawing hereAttach your drawing or a photoAttach your drawing on the quote form

Request a quote
Drawing
None attached
Formats
PDF, STEP, IGES, DWG, DXF, STL, JPG, PNG
Limit
5 files, 20 MB each
Used
Only to prepare your quote