A technician adjusting a sample under the microscope
Adjusting a sample under the microscope

Quality and testing

How a plated part is checked, from the bath to the packing table.

Plating baths
Analysed every day
Plated parts
Thickness, STEP, micropores
Lab chambers
CASS and thermal cycling
Current
Set for each load by SCADA
Final check
Against limit samples

From material to dispatch

Every bath on the lines is analysed daily in our laboratory. Plated parts are tested for thickness, for the potential between the nickel layers and for micropores, and samples go through the CASS chamber and the thermal cycle chamber. At the end of the line, parts are inspected with gloved hands against limit samples of each plating defect, then packed with a pre-dispatch inspection report.

  • The laboratory, wide: benches, reagent shelves and the analysis boardLaboratory
  • Gloved hands trimming the gate off a moulded ABS partMoulding hall
  • Two operators at the SCADA station that sets the current for each loadPlating line
  • An inspector checking a long chrome-plated trim at the inspection tableInspection hall
  1. Raw material and chemicals tested in the laboratoryLaboratory

  2. Moulded parts checked at the machineMoulding hall

  3. Plating baths analysed every dayLaboratory

  4. Current and time set for every load on the linePlating line

  5. Thickness, STEP and micropore tests on plated partsLaboratory

  6. CASS and thermal cycle tests in the laboratoryLaboratory

  7. Parts inspected against limit samples for each defectInspection hall

  8. Pre-dispatch inspection, then packingInspection hall

Send us your drawing

PDF, STEP, DWG or a photo of the part, with roughly how many you need and the finish.

We reply within 2–3 working days.

Call
+91 70278 89712Navit Rathee

Drop your drawing hereAttach your drawing or a photoAttach your drawing on the quote form

Request a quote
Drawing
None attached
Formats
PDF, STEP, IGES, DWG, DXF, STL, JPG, PNG
Limit
5 files, 20 MB each
Used
Only to prepare your quote