The front of the Jain Electroplast works at Nathupur, Sonipat, with its gate
The gate at Nathupur, Sonipat

The plant

Tool room, moulding hall, two plating lines and the laboratory, on one site at Nathupur in Sonipat.

Plant area
5,800 m²
People
About 300
Shifts
Two
Moulding machines
22, from 75 to 660 t
Plating lines
Two, automatic

Through the works, in the order a part goes

The works at Nathupur, Sonipat, covers 5,800 m², and about 300 people work there in two shifts. The tool room, the moulding hall, the two plating lines, the laboratory and the inspection hall share the site, so a part goes from its first drawing to a packed, chrome-plated part without leaving it.

  1. Tool room

    Designs and makes the moulds. A Haas vertical machining centre (CNC) cuts cavities and cores, an Electronica spark erosion machine burns in fine detail, and milling, turning, shaping, drilling and grinding machines do the rest. A 3D printer makes check models of new parts.

    Mould design and making
    The tool room: the VMC, spark erosion, milling and turning machines, with toolmakers at work
    The tool room
    The vertical machining centre cutting a steel block under coolant
    Machining in the tool room
  2. Stores

    Raw material is received and stored here, with a granule store for the moulding hall and a chemical store of its own.

    The stores on the mezzanine: cartons and crates of parts
    The stores
  3. Moulding hall

    Twenty-two injection moulding machines from 75 to 660 t, made by Milacron, Haitian, Nilgiri and Electronica, with 12 mould temperature controllers and a 20 TR chiller. They mould plating-grade ABS.

    Injection moulding
    The moulding hall from the mezzanine: injection moulding machines in two rows along a green walkway
    The moulding hall
    An operator at a Neelgiri injection moulding machine and its robot
    Moulding
  4. Plating lines

    Two fully automatic plating lines. The first plates 340 lots a day; the second, built in 2020 for white goods, plates 300. A SCADA system sets the current for each load, electro-timers hold the time in every tank, and parts leave through a conveyorised drying oven.

    Chrome plating on ABS
    The automatic plating line from above: tanks in a row under the hoist rails
    The plating line
    A rack of moulded white ABS parts hanging from the flight bar, ready to go down the line
    A rack of moulded parts
  5. Vacuum metallising and painting

    An automatic vacuum metallising line, with UV curing for the base coat that goes on before the aluminium. The paint shop sprays UV-cured coats in the colour a customer asks for.

    Vacuum metallising
    The vacuum metallising chamber open, its jig drum loaded with parts
    The metallising chamber
    Spray-coating parts on their jigs
    Lacquer coat
  6. Laboratory

    Analyses the plating baths every day and tests plated parts for the thickness of each layer, the potential between the nickel layers and the micropore count. A CASS chamber tests how the finish resists corrosion, and a thermal cycle chamber takes parts through heat and cold to check the plating stays bonded.

    The laboratory
    The laboratory, wide: benches, reagent shelves and the analysis board
    The laboratory
    A technician at the microscope, close
    At the microscope
  7. Inspection and packing

    Parts are inspected with gloved hands against limit samples of each plating defect, then packed for dispatch. We provide a pre-dispatch inspection (PDI) report.

    Quality assurance
    Two inspectors at the long inspection table under the lights
    Inspection and packing
    An inspector at the lit hood, checking a part against the limit-sample boards
    Against limit samples
  8. Dojo

    The Dojo is the training room at the works, its walls lined with process boards.

    The Dojo, the training room at the works, its walls lined with process boards
    The Dojo

Power, air and water

Power

Two 500 kVA gensets and two UPS units, of 350 kVA and of 300 kVA for the second line, keep the plating running through power cuts. Power comes in through HT transformers of 500 and 1,250 kVA.

Air and water

Two fume scrubbers, of 40 and 30 HP, wash the air drawn from inside the plant, and the effluent treatment plant treats the water from the lines. Two RO plants, of 3,000 and 5,000 litres, purify the water.

Gensets
2 × 500kVA
UPS
350 + 300kVA
HT transformers
500 + 1,250kVA
RO plants
3,000 + 5,000L
Fume scrubbers
40 + 30HP
Air compressors
2 × 10HP
Chiller
20TR
Cooling towers
40 + 30TR

Send us your drawing

PDF, STEP, DWG or a photo of the part, with roughly how many you need and the finish.

We reply within 2–3 working days.

Call
+91 70278 89712Navit Rathee

Drop your drawing hereAttach your drawing or a photoAttach your drawing on the quote form

Request a quote
Drawing
None attached
Formats
PDF, STEP, IGES, DWG, DXF, STL, JPG, PNG
Limit
5 files, 20 MB each
Used
Only to prepare your quote