Quality assurance
Controls on the line, and inspection at the end of it.
- Current
- Set for each load by SCADA
- Tank time
- Held by electro-timers
- Drying
- Conveyorised oven
- Inspection
- Gloved, against limit samples
- Dispatch
- Pre-dispatch inspection report

Process controls
- SCADA sets the plating current for each load
- Electro-timers hold the time in each tank
- Plating baths analysed every day
- Thickness, STEP and micropore tests on plated parts
- CASS and thermal cycle chambers in the laboratory
- Conveyorised drying, so wet parts are hardly handled


Inspection and packing
At the end of the line, parts are inspected with gloved hands. They are checked against limit samples of every plating defect, from pitting and burning to peel-off and dents, then packed for dispatch with a pre-dispatch inspection (PDI) report.
What the inspectors look for
A limit sample is a real part that shows how much of a defect is still acceptable. Parts are checked against them at the end of the line.
Pitting
Small pits in the surface, left where a particle or a gas bubble sat on the part in the bath.
Burning
A rough, dull deposit where the current was too dense, usually on an edge or a corner.
Peel-off
Plating that lifts from the plastic as a blister or a flake, where it did not bond.
Dents
A mark pressed into the part in moulding or handling. On chrome it shows as a bend in the reflection.
Sections through a plated part, the plating drawn far thicker than life.
Send us your drawing
PDF, STEP, DWG or a photo of the part, with roughly how many you need and the finish.
We reply within 2–3 working days.
- Call
- +91 70278 89712Navit Rathee
Drop your drawing hereAttach your drawing or a photoAttach your drawing on the quote form
- Drawing
- None attached
- Formats
- PDF, STEP, IGES, DWG, DXF, STL, JPG, PNG
- Limit
- 5 files, 20 MB each
- Used
- Only to prepare your quote